ha!
I have quite a backlog of work to do on all my vettes. The ZR-1 needs all fluids changed after an amazing track season at RMM
The 89 will get a new windshield, (a big, complicated job on a c4), two minor fiberglass repairs, and a partial repaint, some lcd bulbs, the c68 controller module new resistors.
The 84 gets an engine swap PO overheated it. And paint/weatherstripping.
The 90 caged racecar gets its electrical switches and fire suppression installed.