Recent content by Sparky

  1. S

    Wanted C8 rear low spoiler

    installed my purchased z51 spoiler on my non z51 HTC, worked great
  2. S

    C8 GM High Wing Spoiler Available

    Just received my HTC non z51 vette, bought a z51 spoiler separately and have been told by my dealer that I need a new z51 bumper, supposedly has additional stiffeners for the z51 spoiler. Anyone else running into this problem ?
  3. S

    Corvette c8 spoiler

    Just received my HTC non z51 vette, bought a z51 spoiler separately and have been told by my dealer that I need a new z51 bumper, supposedly has additional stiffeners for the z51 spoiler. Anyone else running into this problem ?
  4. S

    Wanted C8 rear low spoiler

    Just received my HTC non z51 vette, bought a z51 spoiler separately and have been told by my dealer that I need a new z51 bumper, supposedly has additional stiffeners for the z51 spoiler. Anyone else running into this problem ?
  5. S

    Looking for a C8 Z51 rear Spoiler

    I just received my non z51 HTC, bought a z51 spoiler expecting the dealer would install but have been told the z51 spoiler needs a new z51 bumper for $818 CAD, plus paint, plus install. They say the z51 bumper must have additional stiffneers for the spoiler. Anyone else running into this ?
  6. S

    C8 Convertible Production Now Likely August (not July)

    my wheels are on the train today, I'm told I should have it in 2 weeks to Regina. happy times !!
  7. S

    C8 Convertible Production Now Likely August (not July)

    Thanks netsinah, congrats on your delivery, my status is still "bayed"....I wait
  8. S

    C8 Convertible Production Now Likely August (not July)

    any update larryd or netsinah ? My wheels wait, no update on shipping
  9. S

    C8 Convertible Production Now Likely August (not July)

    Maybe mine will hitch a ride on its journey to Regina
  10. S

    C8 Convertible Production Now Likely August (not July)

    congrats Larry, is yours heading for Calgary ?
  11. S

    C8 Convertible Production Now Likely August (not July)

    Anyone know if there is a site to monitor my C8 now that I have a Serial # ?
  12. S

    C8 Convertible Production Now Likely August (not July)

    bayed, not rail tramp unload, have a serial # now, trying to get updated shipping info now....exciting
  13. S

    C8 Convertible Production Now Likely August (not July)

    status 4800 today.....my birthday today, yeha
  14. S

    C8 Convertible Production Now Likely August (not July)

    I also moved to status 3400 on Monday, no build date yet
  15. S

    C8 Convertible Production Now Likely August (not July)

    Congrats Joey Thanks Larry
Back
Top